5958 PRINGLE RD — BP054902
Interior Alterations to Basement. Legalize Basement Finishing. RE: and RE: Front South Floor Framing System. Truss Modifications.
This should only take a moment.
Verifying…
Interior Alterations to Basement. Legalize Basement Finishing. RE: and RE: Front South Floor Framing System. Truss Modifications.
To reinstate a demising wall in an existing building to re-separate two units.
New SFD with Secondary Suite
To construct one side of a new duplex with a Secondary Suite (UNIT 5878)
Permit is to correct non-conformance and make it ready for F2 occupancy.
COM-ALT – partition current retail space into offices
Res Alt – Secondary Suite – One bdrm
INS-ALT – add one wall
SFD-New
SFD-ALT – Adding a covered deck – 24" x 8'
End of content
End of content

KamloopsCity.com is where Kamloops comes together to find out what’s happening, discover local places, connect with the community, and make everyday life in the city a little easier. Locally built and independently run since 2003, with roots in the early Kamloops online community.
Request a new password reset link and try again.