Highway Conditions
Check this page before going on a trip to see current weather, fuel pricing, road conditions, transit information, and other information you need before you start your trip.
Mountain Pass Conditions
Coquihalla Summit

Surrey Lake Summit

Pennask Summit

Eagle Pass

Rogers Pass

Kicking Horse Pass
Highway Travel
Vancouver / Merritt
Hwy 5 South / CoquihallaKamloops → Hope
More info
Bridge maintenance from Highway 5, 759m West of Othello Underpass to 3km Southwest of 4 Kilometre Post. Starting 12:00 AM PDT on Monday October 26, 2026 until 12:00 PM PDT on Saturday October 31, 2026. All day, Monday to Saturday. Right lane closed. Last update: October 28th, 2026 at 6:17pm PDT.
Updated Oct 28, 6:17 pmBridge maintenance from Highway 3, In Hope and Exit 177 to First Avalanche Gate. Starting 8:00 PM PDT on Wednesday October 21, 2026 until 11:45 PM MST on Friday November 13, 2026. From 8:00 AM to 11:45 PM PDT, every day. Right lane closed. Centre lane closed. Expect delays. Last update: October 21st, 2026 at 10:15am PDT. Eastbound right lane and center lane are closed between Exit 171 and before the Highway 3 and Highway 5 junction. Follow posted construction sign.
Updated Oct 21, 10:15 amPaving operations from Highway 5, At Coquihalla Lakes Rd to At Larson Hill. Starting Thu Oct 1. Lane closures in both directions. Watch for traffic control. Expect delays. Last update: October 7th, 2026 at 12:28pm PDT.
Updated Oct 7, 12:28 pmPaving operations from Highway 5, At Box Canyon Chain-Up to At Zopkios Brake Check. Starting Thu Oct 1. Lane closures in both directions. Watch for traffic control. Expect delays. Last update: October 7th, 2026 at 12:20pm PDT.
Updated Oct 7, 12:20 pmConstruction work from Highway 5, At Exit 250 to Larson Hill to At Exit 256 to Coldwater Road. Starting Tue Aug 25. Left lane closed in both directions. Expect delays. Last update: September 5th, 2026 at 6:32pm PDT. 24/7 construction. Please obey signage, slow down and watch for roadside workers. Expect delays.
Updated Sep 5, 6:32 pmSlippery sections between Exit 202: Portia (11 miles south of Great Bear Snowshed) and Exit 228: Coquihalla Lakes Road (9 miles north of Coquihalla Summit). Last update: October 30th, 2026 at 8:43pm PDT. Next update: October 31st, 2026 at 5:00am PDT.
Updated Oct 30, 8:43 pmSlippery sections between Exit 228: Coquihalla Lakes Road (9 miles north of Coquihalla Summit) and Exit 256: Coldwater Road (29 miles south of Merritt). Last update: October 30th, 2026 at 8:43pm PDT. Next update: October 31st, 2026 at 5:00am PDT.
Updated Oct 30, 8:43 pmBridge maintenance at Highway 5, Nicolum Bridge. Starting 10:00 AM PDT on Saturday October 31, 2026 until 12:00 PM PDT on Saturday October 31, 2026. From 10:00 AM to 12:00 PM PDT, Saturday. Left lane blocked. Watch for traffic control. Last update: October 30th, 2026 at 1:30pm PDT. Survey work will be taking place.
Updated Oct 30, 1:30 pmRoad maintenance from Highway 5. Starting 7:00 AM PDT on Saturday October 31, 2026 until 7:00 PM MST on Sunday November 1, 2026. From 7:00 AM to 7:00 PM PDT, weekends. Watch for traffic control. Expect minor delays. Last update: October 28th, 2026 at 12:00pm PDT.
Updated Oct 28, 12:00 pmUtility work from Highway 5A, At Old Nicola Trail to At Saddleman Rd. Starting Mon Nov 16 until Fri Nov 27. From 8:00 AM to 8:00 PM MST, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: October 15th, 2026 at 12:15pm PDT.
Updated Oct 15, 12:15 pmSalmon Arm / Revelstoke / Calgary
Hwy 1 East / Trans-CanadaKamloops → BC / Alberta border
More info
Construction work from Highway 1, In Sicamous and Old Sicamous Road to In Sicamous and Solsqua-Sicamous Road. Starting 9:00 AM PDT on Wednesday August 19, 2026. Watch for traffic control. Last update: October 28th, 2026 at 11:32am PDT. Road Closed 9AM-3PM PT Mon-Sat. Alternate routes Highway 97A and 97B. Local access to Old Sicamous Rd/Old Spallumcheen Rd at top of hour during closure. No thru-traffic. There is NO CLOSURE on Saturday, Oct. 31st.
Updated Oct 28, 11:32 amConstruction work from Highway 1, In Revelstoke and Highway 23 South to In Revelstoke and Victoria Rd. Starting 8:00 AM PDT on Monday October 26, 2026 until 4:00 PM MST on Monday November 30, 2026. Last update: October 26th, 2026 at 9:46pm PDT. Paving Oct 26 to Nov 8. Single lane alternating traffic. Expect 20 minute delays. Columbia Rest Area closed until Nov 30. Use alternate rest area.
Updated Oct 26, 9:46 pmUtility work from Highway 1, Holman Road to Dallas Drive. Starting 8:00 AM MST on Tuesday November 3, 2026 until 4:00 PM MST on Tuesday November 3, 2026. Right lane closed. Reduced to one lane. Watch for traffic control. Last update: October 22nd, 2026 at 10:05am PDT.
Updated Oct 22, 10:05 amUtility work from Highway 1, In Revelstoke and At Alpine Lane W to Alpine Lane W, In Revelstoke and At Alpine Lane W and Trans-Canada Highway E. Starting Mon Oct 26 until Fri Nov 6. From 8:00 AM to 4:00 PM PDT, weekdays. Shoulder closed. Watch for traffic control. Last update: October 19th, 2026 at 1:25pm PDT. Speed reduction with closures up to once per day of less than 5 minutes.
Updated Oct 19, 1:25 pmRest area closed at Highway 1, Redgrave Rest Area. Starting Tue Jul 14. Last update: September 15th, 2026 at 9:06pm MDT. Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses.
Updated Sep 15, 8:06 pmFog patches between Waverly Park Frtg (15 miles east of Chase) and Bernie Road (8 miles west of Sicamous). Last update: October 30th, 2026 at 5:23pm PDT. Next update: October 31st, 2026 at 5:00am PDT.
Updated Oct 30, 5:23 pmBridge construction from Highway 1, At Crazy Ck. Bridge to At Eagle River at Kay Falls Bridge. Starting 7:00 PM PCT on Tuesday November 3, 2026 until 7:00 AM PCT on Wednesday November 4, 2026. From 7:00 PM to 7:00 AM PCT the next day, Tuesday. Single lane alternating traffic. Watch for traffic control. Speed Limit restriction: 50 km/hr. Last update: October 30th, 2026 at 11:33am PDT.
Updated Oct 30, 11:33 amTree pruning from Highway 1 to In Chase. Starting 7:05 AM PCT on Monday November 2, 2026 until 5:30 PM PCT on Friday November 6, 2026. Single lane alternating traffic. Last update: October 29th, 2026 at 4:22pm PDT.
Updated Oct 29, 4:22 pmElectrical maintenance from Highway 1, 59m South of Jack Macdonald Snowshed to 77m East of Lanark Snowshed. Starting 10:00 AM MST on Wednesday November 4, 2026 until 3:00 PM MST on Wednesday November 4, 2026. From 10:00 AM to 3:00 PM MST, Wednesday. Single lane alternating traffic. Watch for traffic control. Last update: October 27th, 2026 at 1:09pm PDT.
Updated Oct 27, 1:09 pmBridge maintenance at Highway 1, At Blaeberry River Bridge. Starting 8:00 AM MDT on Tuesday October 27, 2026 until 6:00 PM CST on Monday November 2, 2026. From 8:00 AM to 6:00 PM MDT, every day. Single lane alternating traffic. Last update: October 27th, 2026 at 9:24am MDT.
Updated Oct 27, 8:24 amCache Creek
Hwy 1 WestKamloops → Cache Creek
More info
Construction work from Highway 1, In Kamloops and 2km West of Copperhead Drive Underpass to At Exit 366 to Copperhead Drive. Starting Tue Aug 25 until Sat Oct 31. Last update: September 16th, 2026 at 4:06pm PDT. Motorists are advised to pull as far ahead as possible and do brake checks in the right lane within the brake check. Washrooms closed, use Hwy 5 – Inks Lake Brake Check..
Updated Sep 16, 4:06 pmUtility work from Highway 1, 11km South of Cache Creek to 12km South of Cache Creek. Starting Mon Apr 27. From 8:00 AM to 4:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: September 15th, 2026 at 8:09pm PDT.
Updated Sep 15, 8:09 pmConstruction work from Highway 1, Nicomen River Rd to At Exit From Highway 1 Northbound to Highway 8. Starting Tue Aug 25 until Wed Jun 30. Single lane alternating traffic. Watch for traffic control. Expect minor delays. Last update: August 25th, 2026 at 2:02pm PDT.
Updated Aug 25, 2:02 pmClearwater / Valemount
Hwy 5 NorthKamloops → Valemount
More info
Road construction at Highway 5, Little Hells Gate. Starting 8:00 AM PDT on Wednesday October 28, 2026 until 5:00 PM MST on Friday November 6, 2026. Single lane alternating traffic. Watch for traffic control. Last update: October 22nd, 2026 at 11:17am PDT. Lane closures between Little Hell's Gate and Six Mile Bridge.
Updated Oct 22, 11:17 amBridge construction at Highway 5, At Six Mile Bridge. Starting 11:00 AM PDT on Thursday September 24, 2026. Last update: October 30th, 2026 at 10:38am PDT. Speed reduction in effect, no other delays or restrictions in place. Please use caution.
Updated Oct 30, 10:38 amRoad construction from Highway 5, Hoirup Rd to Martin Creek FSR. Starting 6:00 AM PDT on Tuesday October 27, 2026 until 5:00 PM MST on Saturday November 7, 2026. From 6:00 AM to 5:00 PM PDT, every day. Single lane alternating traffic. Last update: October 27th, 2026 at 1:55pm PDT. Please obey traffic signs and watch for crews.
Updated Oct 27, 1:55 pmUtility work at Highway 5, At Highway 5 and Vinsula-Knouff Lake Road. Starting 8:00 AM MST on Tuesday November 17, 2026 until 4:00 PM MST on Tuesday November 17, 2026. Single lane alternating traffic. Watch for traffic control. Last update: October 23rd, 2026 at 3:35pm PDT.
Updated Oct 23, 3:35 pmBridge maintenance from Highway 5, At Avola Overhead Bridge to At Avola Bridge. Starting Thu Sep 24. From 6:00 AM to 9:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: September 24th, 2026 at 11:11am PDT.
Updated Sep 24, 11:11 amMowing from Highway 5, At Avola Overhead Bridge to At Blue River Bridge. Starting Thu Sep 24. From 7:00 AM to 7:00 PM PDT, weekdays. Watch for traffic control. Last update: September 24th, 2026 at 11:02am PDT.
Updated Sep 24, 11:02 amRoad construction from Highway 5, At Thunder River Road to At Miledge Creek Bridge. Starting Thu Sep 24 until Sat Nov 7. From 8:00 AM to 5:00 PM PDT, weekdays. Watch for traffic control. Last update: September 24th, 2026 at 10:58am PDT. Single Lane Alternating Traffic will only be required for a brief duration during mobilization and demobilization of materials and equipment.
Updated Sep 24, 10:58 amConstruction work at Highway 5. Starting Tue Sep 8. Last update: September 16th, 2026 at 4:06pm PDT. Watch for crew and equipment working. Use caution when passing.
Updated Sep 16, 4:06 pmKelowna
Hwy 5A / Hwy 97C via Aspen GroveKamloops → Kelowna
More info
Utility work from Highway 97C, In Merritt to At Loon Lake Rd. Starting 8:00 AM MST on Tuesday November 10, 2026 until 4:00 PM MST on Tuesday November 17, 2026. From 8:00 AM to 4:00 PM MST, every day. Lane closures in both directions. Watch for traffic control. Last update: October 27th, 2026 at 4:58pm PDT.
Updated Oct 27, 4:58 pmGeotechnical investigation from Highway 97C, At Brenda Mine Road. Starting Tue Nov 3 until Fri Nov 6. From 7:00 AM to 5:00 PM MST, Tuesday to Friday. Shoulder closed. Right lane closed. Last update: October 15th, 2026 at 12:07pm PDT. Groundwater monitoring.
Updated Oct 15, 12:07 pmHighway 97C. Road cleared between Eight Mile Rd and Brolin Rd (70 km south of Ashcroft). Last updated Wed Oct 28 at 10:07 AM PDT. (DBC-94258)
Updated Oct 28, 10:07 amFog patches between Trepanier Road and Pennask Summit (Pennask Summit). Last update: October 30th, 2026 at 5:24pm PDT. Next update: October 31st, 2026 at 5:00am PDT.
Updated Oct 30, 5:24 pmFog patches between Junction Highway 97 (West Kelowna) and Brenda Mine Road (10 miles east of Pennask Summit). Last update: October 30th, 2026 at 5:20pm PDT. Next update: October 31st, 2026 at 5:00am PDT.
Updated Oct 30, 5:20 pmUtility work from Highway 5A, At Old Nicola Trail to At Saddleman Rd. Starting Mon Nov 16 until Fri Nov 27. From 8:00 AM to 8:00 PM MST, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: October 15th, 2026 at 12:15pm PDT.
Updated Oct 15, 12:15 pmRoad construction at Highway 97C, In Logan Lake and At Highland Valley Copper Mine. Starting Tue Sep 22 until Thu Nov 5. All day, every day. Single lane alternating traffic. Last update: September 22nd, 2026 at 11:30am PDT.
Updated Sep 22, 11:30 amVernon / North Okanagan
Hwy 1 East / Hwy 97 South via FalklandKamloops → Vernon
More info
Utility work from Highway 1, Holman Road to Dallas Drive. Starting 8:00 AM MST on Tuesday November 3, 2026 until 4:00 PM MST on Tuesday November 3, 2026. Right lane closed. Reduced to one lane. Watch for traffic control. Last update: October 22nd, 2026 at 10:05am PDT.
Updated Oct 22, 10:05 amConstruction work from Highway 1, In Kamloops and 2km West of Copperhead Drive Underpass to At Exit 366 to Copperhead Drive. Starting Tue Aug 25 until Sat Oct 31. Last update: September 16th, 2026 at 4:06pm PDT. Motorists are advised to pull as far ahead as possible and do brake checks in the right lane within the brake check. Washrooms closed, use Hwy 5 – Inks Lake Brake Check..
Updated Sep 16, 4:06 pmFog patches between Waverly Park Frtg (15 miles east of Chase) and Bernie Road (8 miles west of Sicamous). Last update: October 30th, 2026 at 5:23pm PDT. Next update: October 31st, 2026 at 5:00am PDT.
Updated Oct 30, 5:23 pmFog patches between Black Road and the end of Highway 97B (Salmon Arm). Last update: October 30th, 2026 at 5:23pm PDT. Next update: October 31st, 2026 at 5:00am PDT.
Updated Oct 30, 5:23 pmTree pruning from Highway 1 to In Chase. Starting 7:05 AM PCT on Monday November 2, 2026 until 5:30 PM PCT on Friday November 6, 2026. Single lane alternating traffic. Last update: October 29th, 2026 at 4:22pm PDT.
Updated Oct 29, 4:22 pmRoad construction from Highway 97, In Spallumcheen. Starting 6:31 AM MST on Monday November 16, 2026 until 5:00 PM MST on Wednesday November 18, 2026. Single lane alternating traffic. Last update: October 22nd, 2026 at 2:45pm PDT. Highland Rd from Hwy 97 to Hwy 97A.
Updated Oct 22, 2:45 pmShoulder maintenance from Highway 97B, In Salmon Arm to In Salmon Arm. Starting Wed Sep 16. From 7:00 AM to 3:30 PM PDT, Wednesday and Thursday. Expect minor delays. Last update: October 1st, 2026 at 2:12pm PDT. Roadside/Shoulder Brushing.
Updated Oct 1, 2:12 pmBridge maintenance at Highway 97. Starting Thu Aug 27. From 8:00 AM to 1:00 PM PDT, Thursday. Single lane alternating traffic. Expect minor delays. Last update: September 15th, 2026 at 3:04pm PDT.
Updated Sep 15, 3:04 pmConstruction work from Highway 1, Ford Rd to Bolton Rd. Starting Mon Sep 14 until Sat Oct 31. From 7:00 AM to 5:00 PM PDT, Monday to Saturday. Last update: September 15th, 2026 at 3:03pm PDT. Watch for crews and equipment. Expect minor delays. Localized speed reductions, lane drops and Intermittent minor stoppages possible.
Updated Sep 15, 3:03 pmFuel Prices
Outdoor Conditions
At-a-glance outdoor planning
Sunrise, Sunset & Daylight
Kamloops, British Columbia
